Digital representation and time-based sequencing of structural components slated for removal, integrating as-built data (surveys/scans) with the construction schedule to visualize demolition phasing, validate sequence accuracy, and mitigate clash risks during deconstruction.
Structuring BIM elements through activity-aligned/WBS-structured organization, with validated time-phasing (4D), ensuring model phasing sequences and data integrity align with the master schedule requirements.